I have two EZFlora controllers, I have an action group setup to execute 4 schedules when I trigger it. First one goes through all zones 45 minutes, then the next one goes, then the third one and finally the fourth one. I have delays set so the 2nd, 3rd and 4th schedules trigger at the appropriate times, which means when it is executed it creates 3 delayed action schedules.
On my control page I have a Stop button that will stop all active zones on both controllers so I can shut the whole thing down. However, when I do that, it leaves the delayed action jobs, which means it will kick on those other controllers when the time comes. Since the delayed action jobs are randomly named, I can't kill them (at least I think). Is there a way to stop everything associated with the action group and clear those delayed actions?